# Nice: extension of avenue Grinda bike path

> Work on the future avenue Grinda bike path, between avenue Henri-Matisse and the former Nice Saint-Augustin station, has begun. It is to be inaugurated in December, with traffic changes in the meantime.

**In brief**: Transport event (severity: info) in Nice (Alpes-Maritimes), first detected on 31 October 2026 at 09:00. Reported by 1 source (1 article), last updated on 31 October 2026 at 09:00.

- Category: Transport
- Severity: Info
- Place: Nice — Alpes-Maritimes
- First detected: 31 October 2026 at 09:00
- Updated: 31 October 2026 at 09:00
- Web page: https://acturadar.com/en/events/5624-nice-extension-of-avenue-grinda-bike-path

## Sources (1 articles)

- [« Elle s’arrêtait au milieu de nulle part » : une piste cyclable de l’ouest de Nice va être prolongée et opérationnelle en décembre](https://www.nicematin.com/societe/transports/elle-s-arretait-au-milieu-de-nulle-part-une-piste-cyclable-de-l-ouest-de-nice-va-etre-prolongee-et-operationnelle-en-decembre-10747749) — Nice-Matin, 31 October 2026 at 09:00

---

Cite as: Acturadar, “Nice: extension of avenue Grinda bike path”, https://acturadar.com/en/events/5624-nice-extension-of-avenue-grinda-bike-path
Methodology: https://acturadar.com/en/methodology
