# TotalEnergies' 'Terres de l'Omois' project raises first concerns in Aisne

> Residents of southern Aisne question the grid connection project carried by TotalEnergies as part of the 'Terres de l'Omois' project, during a meeting in Blesmes.

**In brief**: Environment event (severity: low) in Blesmes (Aisne), first detected on 30 October 2026 at 18:15. Reported by 1 source (1 article), last updated on 30 October 2026 at 18:15.

- Category: Environment
- Severity: Low
- Place: Blesmes — Aisne
- First detected: 30 October 2026 at 18:15
- Updated: 30 October 2026 at 18:15
- Web page: https://acturadar.com/en/events/5077-totalenergies-terres-de-l-omois-project-raises-first-concerns-in-aisne

## Sources (1 articles)

- [« Terres de l’Omois » : le projet de TotalEnergies dans le Sud de l’Aisne face aux premières inquiétudes locales](http://www.lunion.fr/id837174/article/2026-10-30/terres-de-lomois-le-projet-de-totalenergies-dans-le-sud-de-laisne-face-aux) — L'Union, 30 October 2026 at 18:15

---

Cite as: Acturadar, “TotalEnergies' 'Terres de l'Omois' project raises first concerns in Aisne”, https://acturadar.com/en/events/5077-totalenergies-terres-de-l-omois-project-raises-first-concerns-in-aisne
Methodology: https://acturadar.com/en/methodology
