# Strasbourg: Karine C gymnasium leaks, work at a standstill

> The Karine C gymnasium in Strasbourg, part of whose roof was destroyed by a storm in summer 2025, is leaking. Work planned for 2025 is at a standstill, penalizing students and a badminton club.

**In brief**: Society event (severity: low) in Strasbourg (Bas-Rhin), first detected on 30 October 2026 at 17:06. Reported by 1 source (1 article), last updated on 30 October 2026 at 17:06.

- Category: Society
- Severity: Low
- Place: Strasbourg — Bas-Rhin
- First detected: 30 October 2026 at 17:06
- Updated: 30 October 2026 at 17:06
- Web page: https://acturadar.com/en/events/5012-strasbourg-karine-c-gymnasium-leaks-work-at-a-standstill

## Sources (1 articles)

- [Strasbourg. « Une véritable patinoire » : le gymnase Karine C prend l’eau et les travaux se font attendre](https://www.dna.fr/economie/2026/10/30/une-veritable-patinoire-le-gymnase-karine-c-prend-l-eau-et-les-travaux-se-font-attendre) — Dernières Nouvelles d'Alsace, 30 October 2026 at 17:06

---

Cite as: Acturadar, “Strasbourg: Karine C gymnasium leaks, work at a standstill”, https://acturadar.com/en/events/5012-strasbourg-karine-c-gymnasium-leaks-work-at-a-standstill
Methodology: https://acturadar.com/en/methodology
