# Téteghem ESAT in full transformation

> The Téteghem ESAT is in full transformation and highlights the skills of its workers with disabilities. The article describes the operation and evolution of the structure.

**In brief**: Social event (severity: low) in Téteghem (Nord), first detected on 28 November 2026 at 11:23. Reported by 1 source (1 article), last updated on 28 November 2026 at 11:23.

- Category: Social
- Severity: Low
- Place: Téteghem — Nord
- First detected: 28 November 2026 at 11:23
- Updated: 28 November 2026 at 11:23
- Web page: https://acturadar.com/en/events/36179-teteghem-esat-in-full-transformation

## Sources (1 articles)

- [« Ils ont plus de compétences qu’on ne croit » : plongée au coeur de l’Esat de Téteghem, en pleine transformation](http://www.lavoixdunord.fr/1759022/article/2026-11-28/ils-ont-plus-de-competences-qu-ne-croit-plongee-au-coeur-de-l-esat-de-teteghem) — La Voix du Nord, 28 November 2026 at 11:23

---

Cite as: Acturadar, “Téteghem ESAT in full transformation”, https://acturadar.com/en/events/36179-teteghem-esat-in-full-transformation
Methodology: https://acturadar.com/en/methodology
