# Toulon: new footbridge planned for 2028 at l'Escaillon

> The project for a structure spanning the railway line on the l'Escaillon side is due to be completed in 2028, to the relief of local residents.

**In brief**: Transport event (severity: info) in Toulon (Var), first detected on 29 October 2026 at 07:45. Reported by 1 source (1 article), last updated on 29 October 2026 at 07:45.

- Category: Transport
- Severity: Info
- Place: Toulon — Var
- First detected: 29 October 2026 at 07:45
- Updated: 29 October 2026 at 07:45
- Web page: https://acturadar.com/en/events/3605-toulon-new-footbridge-planned-for-2028-at-l-escaillon

## Sources (1 articles)

- [« On l’attend depuis 25 ans » : une nouvelle passerelle va faciliter la vie des habitants de ce quartier de Toulon](https://www.nicematin.com/societe/vie-locale/on-l-attend-depuis-25-ans-une-nouvelle-passerelle-va-faciliter-la-vie-des-habitants-de-ce-quartier-de-toulon-10747831) — Nice-Matin, 29 October 2026 at 07:45

---

Cite as: Acturadar, “Toulon: new footbridge planned for 2028 at l'Escaillon”, https://acturadar.com/en/events/3605-toulon-new-footbridge-planned-for-2028-at-l-escaillon
Methodology: https://acturadar.com/en/methodology
