# Loire: road between Pélussin and Chavanay reopens two years after flood

> The road linking Pélussin to Chavanay reopened on October 16, two years after the collapse of the Chorieux bridge during a torrential flood. A solution has been found for owners whose homes were cut off from access.

**In brief**: Transport event (severity: low) in Chavanay (Loire), first detected on 29 October 2026 at 06:00. Reported by 1 source (1 article), last updated on 29 October 2026 at 06:00.

- Category: Transport
- Severity: Low
- Place: Chavanay — Loire
- First detected: 29 October 2026 at 06:00
- Updated: 29 October 2026 at 06:00
- Web page: https://acturadar.com/en/events/3539-loire-road-between-pelussin-and-chavanay-reopens-two-years-after-flood

## Reported figures

- 1 million
- 120 000 euros

## Sources (1 articles)

- [Loire. Le devis passe d’1 million à 120 000 euros : deux ans après la crue, leur maison est sauvée](https://www.leprogres.fr/economie/2026/10/29/le-devis-passe-d-un-million-a-120-000-euros-deux-ans-apres-la-crue-leur-maison-est-sauvee) — Le Progrès, 29 October 2026 at 06:00

---

Cite as: Acturadar, “Loire: road between Pélussin and Chavanay reopens two years after flood”, https://acturadar.com/en/events/3539-loire-road-between-pelussin-and-chavanay-reopens-two-years-after-flood
Methodology: https://acturadar.com/en/methodology
