# Renovation of Montbéliard Castle enters phase 2

> Starting in January, the buildings of the Chancery, Annex 2, and the castle esplanade in Montbéliard will be renovated. The project aims to transform the entire Montbéliard-Wurtemberg Castle complex, with costs contested by the opposition.

**In brief**: Society event (severity: low) in Montbéliard (Doubs), first detected on 26 November 2026 at 07:00. Reported by 1 source (1 article), last updated on 26 November 2026 at 07:00.

- Category: Society
- Severity: Low
- Place: Montbéliard — Doubs
- First detected: 26 November 2026 at 07:00
- Updated: 26 November 2026 at 07:00
- Web page: https://acturadar.com/en/events/33434-renovation-of-montbeliard-castle-enters-phase-2

## Sources (1 articles)

- [Montbéliard. Après le circuit historique, la rénovation du château va entrer dans sa phase 2 : « Les spécificités ont fait évoluer le périmètre »](https://www.estrepublicain.fr/culture-loisirs/2026/11/26/apres-le-circuit-historique-la-renovation-du-chateau-va-entrer-dans-sa-phase-2-les-specificites-ont-fait-evoluer-le-perimetre) — L'Est Républicain, 26 November 2026 at 07:00

---

Cite as: Acturadar, “Renovation of Montbéliard Castle enters phase 2”, https://acturadar.com/en/events/33434-renovation-of-montbeliard-castle-enters-phase-2
Methodology: https://acturadar.com/en/methodology
