# Fréjus and Saint-Raphaël: soft mobility route transforms the coastline

> Alger Boulevard in Fréjus illustrates the progress of the soft mobility route set to link the ports of Saint-Raphaël and Fréjus. This development is one of the pillars of the Promenade des Bains project.

**In brief**: Transport event (severity: info) in Fréjus (Var), first detected on 28 October 2026 at 18:30. Reported by 1 source (1 article), last updated on 28 October 2026 at 18:30.

- Category: Transport
- Severity: Info
- Place: Fréjus — Var
- First detected: 28 October 2026 at 18:30
- Updated: 28 October 2026 at 18:30
- Web page: https://acturadar.com/en/events/3223-frejus-and-saint-raphael-soft-mobility-route-transforms-the-coastline

## Reported figures

- 28,6 millions d’euros

## Sources (1 articles)

- [À Fréjus et Saint-Raphaël, la voie douce dessine peu à peu un nouveau visage du littoral](https://www.nicematin.com/societe/transports/a-frejus-et-saint-raphael-la-voie-douce-dessine-peu-a-peu-un-nouveau-visage-du-littoral-10740450) — Nice-Matin, 28 October 2026 at 18:30

---

Cite as: Acturadar, “Fréjus and Saint-Raphaël: soft mobility route transforms the coastline”, https://acturadar.com/en/events/3223-frejus-and-saint-raphael-soft-mobility-route-transforms-the-coastline
Methodology: https://acturadar.com/en/methodology
