# Vitry-le-François: extension of urban heating network completed

> After more than a year of work, the extension of the heating network powered by the Vitry-le-François biomass boiler plant is complete. The network now has 72 connected buildings, 25 km of pipes and produces 45 GWh of heat.

**In brief**: Environment event (severity: low) in Vitry-le-François (Marne), first detected on 25 November 2026 at 06:11. Reported by 1 source (1 article), last updated on 25 November 2026 at 06:11.

- Category: Environment
- Severity: Low
- Place: Vitry-le-François — Marne
- First detected: 25 November 2026 at 06:11
- Updated: 25 November 2026 at 06:11
- Web page: https://acturadar.com/en/events/31920-vitry-le-francois-extension-of-urban-heating-network-completed

## Sources (1 articles)

- [Plus de 5 km de canalisations enterrées, 22 bâtiments raccordés… L’extension du réseau de chaleur enfin achevée](http://www.lunion.fr/id842357/article/2026-11-25/plus-de-5-km-de-canalisations-enterrees-22-batiments-raccordes-lextension-du) — L'Union, 25 November 2026 at 06:11

---

Cite as: Acturadar, “Vitry-le-François: extension of urban heating network completed”, https://acturadar.com/en/events/31920-vitry-le-francois-extension-of-urban-heating-network-completed
Methodology: https://acturadar.com/en/methodology
