# Saint-Aubin-Épinay: work begins to repair fire-damaged school

> Work to repair the Saint-Aubin-Épinay school, ravaged by a fire on October 27, 2025, has just begun. Completion is scheduled for April 2027 at the latest.

**In brief**: Social event (severity: low) in Saint-Aubin-Épinay (Seine-Maritime), first detected on 23 November 2026 at 12:09. Reported by 1 source (1 article), last updated on 23 November 2026 at 12:09.

- Category: Social
- Severity: Low
- Place: Saint-Aubin-Épinay — Seine-Maritime
- First detected: 23 November 2026 at 12:09
- Updated: 23 November 2026 at 12:09
- Web page: https://acturadar.com/en/events/29640-saint-aubin-epinay-work-begins-to-repair-fire-damaged-school

## Sources (1 articles)

- [Un an après l’incendie qui avait ravagé l’école près de Rouen, les travaux de remise en état commencent](http://www.paris-normandie.fr/id761544/article/2026-11-23/un-apres-lincendie-qui-avait-ravage-lecole-pres-de-rouen-les-travaux-de-remise) — Paris-Normandie, 23 November 2026 at 12:09

---

Cite as: Acturadar, “Saint-Aubin-Épinay: work begins to repair fire-damaged school”, https://acturadar.com/en/events/29640-saint-aubin-epinay-work-begins-to-repair-fire-damaged-school
Methodology: https://acturadar.com/en/methodology
