# Cruas: resumption of studies on bypassing RD 86

> The municipality of Cruas voted to resume studies for a bypass of the RD 86 and a new bridge. The project aims to address the saturation of this road.

**In brief**: Transport event (severity: low) in Cruas (Ardèche), first detected on 22 November 2026 at 20:30. Reported by 1 source (1 article), last updated on 22 November 2026 at 20:30.

- Category: Transport
- Severity: Low
- Place: Cruas — Ardèche
- First detected: 22 November 2026 at 20:30
- Updated: 22 November 2026 at 20:30
- Web page: https://acturadar.com/en/events/29112-cruas-resumption-of-studies-on-bypassing-rd-86

## Sources (1 articles)

- [Cruas . RD 86 saturée : Cruas vote pour relancer les études de contournement et de pont](https://www.ledauphine.com/politique/2026/11/22/rd-86-saturee-cruas-vote-pour-relancer-les-etudes-de-contournement-et-de-pont) — Le Dauphiné libéré, 22 November 2026 at 20:30

---

Cite as: Acturadar, “Cruas: resumption of studies on bypassing RD 86”, https://acturadar.com/en/events/29112-cruas-resumption-of-studies-on-bypassing-rd-86
Methodology: https://acturadar.com/en/methodology
