# Toulouse Swimming City will not be ready by the scheduled date

> The building permit for the Swimming City was issued in May, but the construction site will not start in 2026 as planned. The future Olympic pool, which will bear the name of Léon Marchand, is planned on Ramier Island.

**In brief**: Society event (severity: low) in Toulouse (Haute-Garonne), first detected on 22 November 2026 at 07:51. Reported by 1 source (1 article), last updated on 22 November 2026 at 07:51.

- Category: Society
- Severity: Low
- Place: Toulouse — Haute-Garonne
- First detected: 22 November 2026 at 07:51
- Updated: 22 November 2026 at 07:51
- Web page: https://acturadar.com/en/events/28446-toulouse-swimming-city-will-not-be-ready-by-the-scheduled-date

## Sources (1 articles)

- [DECRYPTAGE. Future piscine Léon Marchand : pourquoi la Cité de la natation à Toulouse, ne se fera finalement pas prête à la date espérée](https://www.ladepeche.fr/2026/11/22/decryptage-future-piscine-leon-marchand-pourquoi-la-cite-de-la-natation-a-toulouse-ne-se-fera-finalement-pas-prete-a-la-date-esperee-13661383.php) — La Dépêche du Midi, 22 November 2026 at 07:51

---

Cite as: Acturadar, “Toulouse Swimming City will not be ready by the scheduled date”, https://acturadar.com/en/events/28446-toulouse-swimming-city-will-not-be-ready-by-the-scheduled-date
Methodology: https://acturadar.com/en/methodology
