# Toulouse-Blagnac Concorde runway judged perfectly flat

> After surveys carried out in spring 2025, runway 32L at Toulouse-Blagnac airport, built for Concorde, has been judged perfectly flat. According to the Concorde Professionals Association, the supersonic aircraft could still take off at full load after analysis.

**In brief**: Transport event (severity: low) in Aéroport Toulouse-Blagnac (Haute-Garonne), first detected on 21 November 2026 at 10:07. Reported by 1 source (1 article), last updated on 21 November 2026 at 10:07.

- Category: Transport
- Severity: Low
- Place: Aéroport Toulouse-Blagnac — Haute-Garonne
- First detected: 21 November 2026 at 10:07
- Updated: 21 November 2026 at 10:07
- Web page: https://acturadar.com/en/events/27662-toulouse-blagnac-concorde-runway-judged-perfectly-flat

## Sources (1 articles)

- [La "piste Concorde" de Toulouse-Blagnac affiche une planéité exemplaire... Après analyses, le supersonique pourrait encore y décoller à pleine charge](https://www.ladepeche.fr/2026/11/21/la-piste-concorde-de-toulouse-blagnac-affiche-une-planeite-exemplaire-apres-analyse-le-supersonique-pourrait-encore-y-decoller-a-pleine-charge-13663325.php) — La Dépêche du Midi, 21 November 2026 at 10:07

---

Cite as: Acturadar, “Toulouse-Blagnac Concorde runway judged perfectly flat”, https://acturadar.com/en/events/27662-toulouse-blagnac-concorde-runway-judged-perfectly-flat
Methodology: https://acturadar.com/en/methodology
