# Grand Reims: modernized sorting center to process waste

> The Grand Reims sorting center has been modernized and can now process 8 tonnes of waste per hour. Machines have replaced some human work, but manual inspection remains necessary.

**In brief**: Environment event (severity: low) in Grand Reims (Marne), first detected on 21 November 2026 at 06:37. Reported by 1 source (1 article), last updated on 21 November 2026 at 06:37.

- Category: Environment
- Severity: Low
- Place: Grand Reims — Marne
- First detected: 21 November 2026 at 06:37
- Updated: 21 November 2026 at 06:37
- Web page: https://acturadar.com/en/events/27443-grand-reims-modernized-sorting-center-to-process-waste

## Sources (1 articles)

- [EN PHOTOS. Un centre de tri modernisé pour traiter les déchets du Grand Reims](http://www.lunion.fr/id841605/article/2026-11-21/en-photos-un-centre-de-tri-modernise-pour-traiter-les-dechets-du-grand-reims) — L'Union, 21 November 2026 at 06:37

---

Cite as: Acturadar, “Grand Reims: modernized sorting center to process waste”, https://acturadar.com/en/events/27443-grand-reims-modernized-sorting-center-to-process-waste
Methodology: https://acturadar.com/en/methodology
