# The Cailly must remake its bed in Seine-Maritime

> Buried in the 1960s, the Cailly river must resurface thanks to works planned for 2027. The project aims to recreate ecological continuity with the Seine.

**In brief**: Environment event (severity: low) in Seine-Maritime, first detected on 21 November 2026 at 01:50. Reported by 1 source (1 article), last updated on 21 November 2026 at 01:50.

- Category: Environment
- Severity: Low
- Place: Seine-Maritime
- First detected: 21 November 2026 at 01:50
- Updated: 21 November 2026 at 01:50
- Web page: https://acturadar.com/en/events/27387-the-cailly-must-remake-its-bed-in-seine-maritime

## Sources (1 articles)

- [En Seine-Maritime, le Cailly refait son lit](https://www.liberation.fr/forums/en-seine-maritime-le-cailly-refait-son-lit-20261121_WB2WVL5V6ZCGZL76BIRNKECBFA/) — Libération, 21 November 2026 at 01:50

---

Cite as: Acturadar, “The Cailly must remake its bed in Seine-Maritime”, https://acturadar.com/en/events/27387-the-cailly-must-remake-its-bed-in-seine-maritime
Methodology: https://acturadar.com/en/methodology
