# Hénin-Beaumont: 100 homes planned on the former Fulloy farm site

> A hundred homes are to be built by the end of 2028 on the site of the former Fulloy farm in Hénin-Beaumont.

**In brief**: Society event (severity: low) in Hénin-Beaumont, ancienne ferme Fulloy (Pas-de-Calais), first detected on 19 November 2026 at 18:02. Reported by 1 source (1 article), last updated on 19 November 2026 at 18:02.

- Category: Society
- Severity: Low
- Place: Hénin-Beaumont, ancienne ferme Fulloy — Pas-de-Calais
- First detected: 19 November 2026 at 18:02
- Updated: 19 November 2026 at 18:02
- Web page: https://acturadar.com/en/events/25706-henin-beaumont-100-homes-planned-on-the-former-fulloy-farm-site

## Sources (1 articles)

- [D’ici fin 2028, 100 logements vont sortir de terre à la place de l’ancienne ferme Fulloy à Hénin-Beaumont](http://www.lavoixdunord.fr/1756402/article/2026-11-19/d-ici-fin-2028-100-logements-vont-sortir-de-terre-la-place-de-l-ancienne-ferme) — La Voix du Nord, 19 November 2026 at 18:02

---

Cite as: Acturadar, “Hénin-Beaumont: 100 homes planned on the former Fulloy farm site”, https://acturadar.com/en/events/25706-henin-beaumont-100-homes-planned-on-the-former-fulloy-farm-site
Methodology: https://acturadar.com/en/methodology
