# Gard: Roquemaure bridge closed for in-depth diagnostic

> The Roquemaure bridge, built nearly 70 years ago, is closed to traffic while an in-depth diagnostic is carried out on its condition. It is one of 3,200 structures examined in the Gard.

**In brief**: Transport event (severity: low) in Roquemaure (Gard), first detected on 27 October 2026 at 20:01. Reported by 1 source (1 article), last updated on 27 October 2026 at 20:01.

- Category: Transport
- Severity: Low
- Place: Roquemaure — Gard
- First detected: 27 October 2026 at 20:01
- Updated: 27 October 2026 at 20:01
- Web page: https://acturadar.com/en/events/2429-gard-roquemaure-bridge-closed-for-in-depth-diagnostic

## Sources (1 articles)

- [Fermeture totale, caméras dans la structure et déviation : pourquoi le pont de Roquemaure est minutieusement ausculté comme 3 200 autres ouvrages d'art](https://france3-regions.franceinfo.fr/occitanie/gard/nimes/fermeture-totale-cameras-dans-la-structure-et-deviation-pourquoi-le-pont-de-roquemaure-est-minutieusement-ausculte-comme-3-200-autres-ouvrages-d-art-3440205.html) — France 3 Régions, 27 October 2026 at 20:01

---

Cite as: Acturadar, “Gard: Roquemaure bridge closed for in-depth diagnostic”, https://acturadar.com/en/events/2429-gard-roquemaure-bridge-closed-for-in-depth-diagnostic
Methodology: https://acturadar.com/en/methodology
