# Neuilly-Crimolois: traffic disrupted until end of November

> Work on sewage and drinking water networks is disrupting traffic in Neuilly-Crimolois. Disruptions are expected to last until the end of November.

**In brief**: Transport event (severity: low) in Neuilly-Crimolois (Côte-d'Or), first detected on 18 November 2026 at 13:48. Reported by 1 source (1 article), last updated on 18 November 2026 at 13:48.

- Category: Transport
- Severity: Low
- Place: Neuilly-Crimolois — Côte-d'Or
- First detected: 18 November 2026 at 13:48
- Updated: 18 November 2026 at 13:48
- Web page: https://acturadar.com/en/events/24117-neuilly-crimolois-traffic-disrupted-until-end-of-november

## Sources (1 articles)

- [Travaux. Traversée de Neuilly-Crimolois : jusqu'à fin novembre, la circulation sera perturbée](https://www.bienpublic.com/transport/2026/11/18/vingt-trois-minutes-de-bouchon-mardi-matin-on-vous-dit-pourquoi) — Le Bien Public, 18 November 2026 at 13:48

---

Cite as: Acturadar, “Neuilly-Crimolois: traffic disrupted until end of November”, https://acturadar.com/en/events/24117-neuilly-crimolois-traffic-disrupted-until-end-of-november
Methodology: https://acturadar.com/en/methodology
