# Bastia: demolition of the old wastewater treatment plant at the commercial port

> The demolition work of the old wastewater treatment plant in Bastia, which had been halted since 2013, has begun for a duration of five months. The project costs €1.1 million and aims to free up 1,100 square meters at the commercial port.

**In brief**: Environment event (severity: low) in Bastia (Haute-Corse), first detected on 16 November 2026 at 19:16. Reported by 1 source (1 article), last updated on 16 November 2026 at 19:16.

- Category: Environment
- Severity: Low
- Place: Bastia — Haute-Corse
- First detected: 16 November 2026 at 19:16
- Updated: 16 November 2026 at 19:16
- Web page: https://acturadar.com/en/events/21848-bastia-demolition-of-the-old-wastewater-treatment-plant-at-the-commercial-port

## Reported figures

- 1,1 million d’euros

## Sources (1 articles)

- [À Bastia, l’ancienne station d’épuration sur le port de commerce va bientôt disparaître](https://www.corsenetinfos.corsica/A-Bastia-l-ancienne-station-d-epuration-sur-le-port-de-commerce-va-bientot-disparaitre_a93710.html) — Corse Net Infos, 16 November 2026 at 19:16

---

Cite as: Acturadar, “Bastia: demolition of the old wastewater treatment plant at the commercial port”, https://acturadar.com/en/events/21848-bastia-demolition-of-the-old-wastewater-treatment-plant-at-the-commercial-port
Methodology: https://acturadar.com/en/methodology
