# The new T Zen 4 bus line, which costs 165 million euros, is put into service without its electric vehicles, causing malfunctions.

> The new T Zen 4 bus line, which costs 165 million euros, is put into service without its electric vehicles, causing malfunctions.

**In brief**: Transport event (severity: low) in Essonne, first detected on 15 November 2026 at 08:42. Reported by 1 source (1 article), last updated on 15 November 2026 at 08:42.

- Category: Transport
- Severity: Low
- Place: Essonne
- First detected: 15 November 2026 at 08:42
- Updated: 15 November 2026 at 08:42
- Web page: https://acturadar.com/en/events/20224-the-new-t-zen-4-bus-line-which-costs-165-million-euros-is-put-into-service

## Reported figures

- 165 millions d’euros

## Sources (1 articles)

- [« Il peut y avoir des couacs » : la nouvelle ligne T Zen 4 à 165 millions d’euros privée de ses véhicules électriques](https://www.leparisien.fr/essonne-91/il-peut-y-avoir-des-couacs-la-nouvelle-ligne-t-zen-4-a-165-millions-deuros-privee-de-ses-vehicules-electriques-15-11-2026-UKTEI53B35GKXEQCDWHAHZY5UQ.php) — Le Parisien, 15 November 2026 at 08:42

---

Cite as: Acturadar, “The new T Zen 4 bus line, which costs 165 million euros, is put into service without its electric vehicles, causing malfunctions.”, https://acturadar.com/en/events/20224-the-new-t-zen-4-bus-line-which-costs-165-million-euros-is-put-into-service
Methodology: https://acturadar.com/en/methodology
