# RD888: Baraqueville bypass completed, 2x2 lanes project continues

> Since the bypass opened, Baraqueville has been relieved of traffic, while the project to convert the RD888 between Rodez and the A75 to two lanes in each direction continues.

**In brief**: Transport event (severity: info) in Baraqueville (Aveyron), first detected on 14 November 2026 at 07:01. Reported by 1 source (1 article), last updated on 14 November 2026 at 07:01.

- Category: Transport
- Severity: Info
- Place: Baraqueville — Aveyron
- First detected: 14 November 2026 at 07:01
- Updated: 14 November 2026 at 07:01
- Web page: https://acturadar.com/en/events/19746-rd888-baraqueville-bypass-completed-2x2-lanes-project-continues

## Sources (1 articles)

- [NOTRE DOSSIER. RD888 à 2x2 voies entre Rodez et l'A75 : depuis le contournement, Baraqueville respire à nouveau - Centre Presse Aveyron](https://news.google.com/rss/articles/CBMi-AFBVV95cUxPQUhOWnRJYzI4N1dJNVMtdVY1T2YyRThlS3pFcTFjdHFDRE5vSnAyNGFac3otWExia3ZPMXg2QlQtTFRLS1g2d2Q1QV9kaHhKcHhrTkNNcWZWSm9KaWRkdXBxNXBDWTBMb016R2NGMXpNc1hyUWNjaW5HMGl6TlBlWTdVdDFwUmhpZGxtOVRwNUwwSVNjLXFXbklHZXgxVE9NT2ZpR1JjODdzaGlyTzhFQldvTGJRUktPeVlPRXNJekU3dE1rVDNiM2VKSlZ3akRuNThJbGFiMXJfY2NjVjNrc2JkbkF0bzFhY2psNW5QSUpzX09qT3FWNA?oc=5) — centrepresseaveyron.fr, 14 November 2026 at 07:01

---

Cite as: Acturadar, “RD888: Baraqueville bypass completed, 2x2 lanes project continues”, https://acturadar.com/en/events/19746-rd888-baraqueville-bypass-completed-2x2-lanes-project-continues
Methodology: https://acturadar.com/en/methodology
