# Salindres: Rio Tinto completes rehabilitation of former Pechiney basins

> After more than a year of work and €17 million, Rio Tinto has completed the first phase of rehabilitation of the former industrial basins in Salindres (Gard).

**In brief**: Environment event (severity: low) in Salindres (Gard), first detected on 12 November 2026 at 17:01. Reported by 1 source (1 article), last updated on 12 November 2026 at 17:01.

- Category: Environment
- Severity: Low
- Place: Salindres — Gard
- First detected: 12 November 2026 at 17:01
- Updated: 12 November 2026 at 17:01
- Web page: https://acturadar.com/en/events/17638-salindres-rio-tinto-completes-rehabilitation-of-former-pechiney-basins

## Reported figures

- 17 millions d’euros

## Sources (1 articles)

- ["Il n’y a pas de fatalité" : à Salindres, Rio Tinto sécurise l’héritage industriel de Pechiney avec une réhabilitation à 17 millions d’euros](https://www.midilibre.fr/2026/11/12/il-ny-a-pas-de-fatalite-a-salindres-rio-tinto-securise-lheritage-industriel-de-pechiney-avec-une-rehabilitation-a-17-millions-deuros-13649100.php) — Midi Libre, 12 November 2026 at 17:01

---

Cite as: Acturadar, “Salindres: Rio Tinto completes rehabilitation of former Pechiney basins”, https://acturadar.com/en/events/17638-salindres-rio-tinto-completes-rehabilitation-of-former-pechiney-basins
Methodology: https://acturadar.com/en/methodology
