# Chooz nuclear power plant returns to full capacity after drought episode

> Production unit No. 2 of the Chooz nuclear power plant was reconnected to the grid on November 9, 2026, with both units now operating at full capacity.

**In brief**: Economy event (severity: low) in Chooz (Ardennes), first detected on 10 November 2026 at 21:02. Reported by 1 source (1 article), last updated on 10 November 2026 at 21:02.

- Category: Economy
- Severity: Low
- Place: Chooz — Ardennes
- First detected: 10 November 2026 at 21:02
- Updated: 10 November 2026 at 21:02
- Web page: https://acturadar.com/en/events/15781-chooz-nuclear-power-plant-returns-to-full-capacity-after-drought-episode

## Sources (1 articles)

- [La centrale de Chooz tourne à nouveau à plein régime après un « épisode de sécheresse inédit »](http://www.lunion.fr/id839378/article/2026-11-10/la-centrale-de-chooz-tourne-nouveau-plein-regime-apres-un-episode-de-secheresse) — L'Union, 10 November 2026 at 21:02

---

Cite as: Acturadar, “Chooz nuclear power plant returns to full capacity after drought episode”, https://acturadar.com/en/events/15781-chooz-nuclear-power-plant-returns-to-full-capacity-after-drought-episode
Methodology: https://acturadar.com/en/methodology
