# Les Matelles: 300,000 euros of work to bring the school up to code after a critical report

> Following the inspection of the Les Matelles school group by a safety commission in May 2026, the new mayor must undertake major work to bring the buildings up to standard and denounces a passing of responsibility by the previous team.

**In brief**: Security event (severity: low) in Les Matelles (Hérault), first detected on 9 November 2026 at 18:38. Reported by 1 source (1 article), last updated on 9 November 2026 at 18:38.

- Category: Security
- Severity: Low
- Place: Les Matelles — Hérault
- First detected: 9 November 2026 at 18:38
- Updated: 9 November 2026 at 18:38
- Web page: https://acturadar.com/en/events/14920-les-matelles-300-000-euros-of-work-to-bring-the-school-up-to-code-after-a

## Reported figures

- 300 000 euros

## Sources (1 articles)

- ["Sensible/dangereuse" : une petite commune va devoir débourser 300 000 euros pour remettre aux normes son école après un rapport qui critique la sécurité](https://france3-regions.franceinfo.fr/occitanie/herault/montpellier/sensible-dangereuse-une-petite-commune-va-devoir-debourser-300-000-euros-pour-remettre-aux-normes-son-ecole-apres-un-rapport-qui-critique-la-securite-3445365.html) — France 3 Régions, 9 November 2026 at 18:38

---

Cite as: Acturadar, “Les Matelles: 300,000 euros of work to bring the school up to code after a critical report”, https://acturadar.com/en/events/14920-les-matelles-300-000-euros-of-work-to-bring-the-school-up-to-code-after-a
Methodology: https://acturadar.com/en/methodology
