# A €60 million viaduct must free a village from RN2 traffic

> Construction of a 40-meter-high viaduct, estimated at €60 million, is intended to divert RN2 traffic away from a village. The long-awaited project is presented as a deliverance for residents.

**In brief**: Transport event (severity: low), first detected on 10 November 2026 at 06:30. Reported by 1 source (1 article), last updated on 10 November 2026 at 06:30.

- Category: Transport
- Severity: Low
- Place: Not located
- First detected: 10 November 2026 at 06:30
- Updated: 10 November 2026 at 06:30
- Web page: https://acturadar.com/en/events/14789-a-60-million-viaduct-must-free-a-village-from-rn2-traffic

## Reported figures

- 60 millions d’euros

## Sources (1 articles)

- [« En 1970, on en parlait déjà » : un village bientôt libéré du trafic de la RN2 grâce à un viaduc de 40 mètres de haut à 60 millions d’euros](https://www.leparisien.fr/oise-60/en-1970-on-en-parlait-deja-un-village-bientot-libere-du-trafic-de-la-rn2-grace-a-un-viaduc-de-40-metres-de-haut-a-60-millions-deuros-10-11-2026-DY4IESR6BFBMZGOBBTQ3KYOWZY.php) — Le Parisien, 10 November 2026 at 06:30

---

Cite as: Acturadar, “A €60 million viaduct must free a village from RN2 traffic”, https://acturadar.com/en/events/14789-a-60-million-viaduct-must-free-a-village-from-rn2-traffic
Methodology: https://acturadar.com/en/methodology
