# Rodez: Club 3.0 work continues ahead of 2028 opening

> Work on the Club 3.0 site in Rodez is progressing, with an opening scheduled for early 2028.

**In brief**: Society event (severity: info) in Rodez (Aveyron), first detected on 9 November 2026 at 07:30. Reported by 1 source (1 article), last updated on 9 November 2026 at 07:30.

- Category: Society
- Severity: Info
- Place: Rodez — Aveyron
- First detected: 9 November 2026 at 07:30
- Updated: 9 November 2026 at 07:30
- Web page: https://acturadar.com/en/events/13801-rodez-club-3-0-work-continues-ahead-of-2028-opening

## Sources (1 articles)

- [Le site se devait d évoluer : dans les coulisses des travaux du Club 3 . 0 à Rodez en attendant louverture prévue début 2028](https://www.centrepresseaveyron.fr/2026/11/09/le-site-se-devait-devoluer-dans-les-coulisses-des-travaux-du-club-30-a-rodez-en-attendant-louverture-prevue-debut-2028-13638209.php) — centrepresseaveyron.fr, 9 November 2026 at 07:30

---

Cite as: Acturadar, “Rodez: Club 3.0 work continues ahead of 2028 opening”, https://acturadar.com/en/events/13801-rodez-club-3-0-work-continues-ahead-of-2028-opening
Methodology: https://acturadar.com/en/methodology
