# Chaussée Brunehaut roadworks for one month in Auchy-au-Bois starting November 12

> One-month roadworks begin Thursday, November 12 on Chaussée Brunehaut in Auchy-au-Bois, Pas-de-Calais, following a similar project in Ferfay.

**In brief**: Transport event (severity: info) in Auchy-au-Bois (Pas-de-Calais), first detected on 8 November 2026 at 14:00. Reported by 1 source (1 article), last updated on 8 November 2026 at 14:00.

- Category: Transport
- Severity: Info
- Place: Auchy-au-Bois — Pas-de-Calais
- First detected: 8 November 2026 at 14:00
- Updated: 8 November 2026 at 14:00
- Web page: https://acturadar.com/en/events/13168-chaussee-brunehaut-roadworks-for-one-month-in-auchy-au-bois-starting-november-12

## Sources (1 articles)

- [Après Ferfay, la Chaussée Brunehaut en travaux un mois à Auchy-au-Bois dès le jeudi 12 novembre](http://www.lavoixdunord.fr/1753105/article/2026-11-08/apres-ferfay-la-chaussee-brunehaut-en-travaux-un-mois-auchy-au-bois-des-le-jeudi) — La Voix du Nord, 8 November 2026 at 14:00

---

Cite as: Acturadar, “Chaussée Brunehaut roadworks for one month in Auchy-au-Bois starting November 12”, https://acturadar.com/en/events/13168-chaussee-brunehaut-roadworks-for-one-month-in-auchy-au-bois-starting-november-12
Methodology: https://acturadar.com/en/methodology
