# Vecquemont: Filante school renovated to reduce energy consumption

> Classrooms at Vecquemont school have been insulated and ceilings lowered to improve the building's energy performance. The total project cost is €302,236, funded in part by the state and the department.

**In brief**: Environment event (severity: info) in Vecquemont (Somme), first detected on 8 November 2026 at 13:04. Reported by 1 source (1 article), last updated on 8 November 2026 at 13:04.

- Category: Environment
- Severity: Info
- Place: Vecquemont — Somme
- First detected: 8 November 2026 at 13:04
- Updated: 8 November 2026 at 13:04
- Web page: https://acturadar.com/en/events/13111-vecquemont-filante-school-renovated-to-reduce-energy-consumption

## Reported figures

- 302 236 euros
- 85 928 €
- 46 718 euros
- 7 729 euros

## Sources (1 articles)

- [Vecquemont : l’École Filante sera plus économe en énergie](http://www.paris-normandie.fr/id757984/article/2026-11-08/vecquemont-lecole-filante-sera-plus-econome-en-energie) — Paris-Normandie, 8 November 2026 at 13:04

---

Cite as: Acturadar, “Vecquemont: Filante school renovated to reduce energy consumption”, https://acturadar.com/en/events/13111-vecquemont-filante-school-renovated-to-reduce-energy-consumption
Methodology: https://acturadar.com/en/methodology
