# Cassel: 80,000 euros of accessibility work at the secondary school

> The secondary school in Cassel has benefited from 80,000 euros of accessibility compliance work.

**In brief**: Society event (severity: info) in Cassel (Nord), first detected on 7 November 2026 at 10:24. Reported by 1 source (1 article), last updated on 7 November 2026 at 10:24.

- Category: Society
- Severity: Info
- Place: Cassel — Nord
- First detected: 7 November 2026 at 10:24
- Updated: 7 November 2026 at 10:24
- Web page: https://acturadar.com/en/events/12232-cassel-80-000-euros-of-accessibility-work-at-the-secondary-school

## Reported figures

- 80 000 €

## Sources (1 articles)

- [Le collège de Cassel a bénéficié de 80 000 € de travaux de mise aux normes d’accessibilité](http://www.lavoixdunord.fr/1752772/article/2026-11-07/le-college-de-cassel-beneficie-de-80-000-eu-de-travaux-de-mise-aux-normes-d) — La Voix du Nord, 7 November 2026 at 10:24

---

Cite as: Acturadar, “Cassel: 80,000 euros of accessibility work at the secondary school”, https://acturadar.com/en/events/12232-cassel-80-000-euros-of-accessibility-work-at-the-secondary-school
Methodology: https://acturadar.com/en/methodology
