# Toulouse: Herbettes bridge height barriers still missing

> Vans continue to get stuck under the SNCF bridge on avenue des Herbettes in Toulouse, the installed then damaged height barriers not having been replaced.

**In brief**: Transport event (severity: low) in Toulouse (Haute-Garonne), first detected on 26 October 2026 at 06:00. Reported by 1 source (2 articles), last updated on 30 October 2026 at 14:03.

- Category: Transport
- Severity: Low
- Place: Toulouse — Haute-Garonne
- First detected: 26 October 2026 at 06:00
- Updated: 30 October 2026 at 14:03
- Web page: https://acturadar.com/en/events/1189-toulouse-herbettes-bridge-height-barriers-still-missing

## Sources (2 articles)

- [Pont "maudit" à Toulouse : mais pourquoi les portiques installés en avril 2026, puis endommagés, n'ont-ils pas été remplacés ?](https://www.ladepeche.fr/2026/10/26/pont-maudit-a-toulouse-mais-pourquoi-les-portiques-installes-en-avril-2026-puis-endommages-nont-ils-pas-ete-remplaces-13605104.php) — La Dépêche du Midi, 26 October 2026 at 06:00
- [Pont maudit de Toulouse : des panneaux jaune fluo pour alerter les chauffeurs, mais toujours pas de portique pour arrêter les camions](https://www.ladepeche.fr/2026/10/30/pont-maudit-de-toulouse-des-panneaux-jaune-fluo-pour-alerter-les-chauffeurs-mais-toujours-pas-de-portique-pour-arreter-les-camions-13627532.php) — La Dépêche du Midi, 30 October 2026 at 14:03

---

Cite as: Acturadar, “Toulouse: Herbettes bridge height barriers still missing”, https://acturadar.com/en/events/1189-toulouse-herbettes-bridge-height-barriers-still-missing
Methodology: https://acturadar.com/en/methodology
