# Le Sourd: second phase of church renovation through an integration worksite

> The Thiérache du Centre integration worksite continues the renovation of Le Sourd church, with about ten employees mobilized until the end of February 2027.

**In brief**: Society event (severity: info) in Le Sourd (Aisne), first detected on 5 November 2026 at 10:44. Reported by 1 source (1 article), last updated on 5 November 2026 at 10:44.

- Category: Society
- Severity: Info
- Place: Le Sourd — Aisne
- First detected: 5 November 2026 at 10:44
- Updated: 5 November 2026 at 10:44
- Web page: https://acturadar.com/en/events/10126-le-sourd-second-phase-of-church-renovation-through-an-integration-worksite

## Sources (1 articles)

- [À Le Sourd, l’église poursuit sa rénovation grâce au chantier d’insertion](http://www.paris-normandie.fr/id757266/article/2026-11-05/le-sourd-leglise-poursuit-sa-renovation-grace-au-chantier-dinsertion) — Paris-Normandie, 5 November 2026 at 10:44

---

Cite as: Acturadar, “Le Sourd: second phase of church renovation through an integration worksite”, https://acturadar.com/en/events/10126-le-sourd-second-phase-of-church-renovation-through-an-integration-worksite
Methodology: https://acturadar.com/en/methodology
